Parse your Hawthorne correction letter
Upload a plan check correction letter from the City of Hawthorne. Olumba Align reads every comment, sorts by department, and flags code references.
No signup required. PDF only.
โฆ Olumba ยท Parsed Results
Found 1 department in Hawthorne plan check letters.
Hawthorne plan check departments
Building & Safety
Hawthorne correction letters group items under section headings โ plan requirements, design requirements, framing, concrete and foundations, energy code โ rather than by reviewing department. Items run in one continuous numbered list through the whole letter, and 88% of them name the specific drawing sheet they apply to.
What we know about Hawthorne plan checks
Across the 22 Hawthorne correction letters we have parsed, the median letter carries 92 items and the range runs from 4 to 239. A Hawthorne letter is rarely a short read.
88% of Hawthorne correction items name a specific drawing sheet, which makes them unusually easy to route to whoever owns that sheet. Only about 7% cite a code section directly, so the sheet reference is what you sort by.
Because Hawthorne numbers items continuously instead of grouping them by department, a 90-item letter is easy to lose track of during resubmittal. Parsing it into a checklist first means every number has an owner before anyone starts redrawing.
We do not publish a Hawthorne review-time figure. The letters we have read do not record when the set was filed, so any number we gave you would be a guess.
One caveat on all of the above: these 22 letters come from projects we have worked on ourselves, not from a random sample of Hawthorne submittals. Read them as a well-informed starting point rather than a citywide statistic.
โฆ Want Olumba to track responses?
Create a free account โ Olumba saves these corrections to a project and tracks each department's response automatically.
Start free โGot a Hawthorne correction letter?
Upload it. See your checklist in 30 seconds. Free.
Try Olumba Align โ Free