Olumba Blog

Insights for A&E Teams

Practical guidance on RFI management, design collaboration, and document control for architecture and engineering professionals.

Industry Insights

Asana Alternatives for Architecture Projects

Asana is a capable task manager. But design projects need version control, consultant access, and AEC workflows that Asana wasn't built to handle.

Ugo·March 23, 2026·4 min read
Industry Insights

Olumba vs. Monday.com for Architecture Teams

Monday.com is flexible and well-designed. But architecture projects need version control and AEC terminology that generic tools don't ship with.

Ugo Mbelu·March 19, 2026·3 min read
Project Management

Drawing Numbering for Multi-Discipline Sets

A drawing numbering system needs to survive a multi-discipline set with hundreds of sheets — and still make sense to someone in the field. Here's what that looks like.

Ugo Mbelu·March 16, 2026·5 min read
Project Management

Client Access Boundaries on A&E Projects

Giving clients access to your project is smart. Giving them access to everything is a mistake. Here's how to think about the right level of client visibility.

Ugo Mbelu·March 14, 2026·4 min read
Design Collaboration

Faster Client Approvals Without the Weekly Chase

Slow client approvals are one of the most common causes of schedule slippage on design projects. Here's how to structure the process so clients approve things faster.

Ugo Mbelu·March 14, 2026·4 min read
Design Collaboration

Why Email Fails on Design Projects

Email was never built for project coordination. But that's how most design teams use it. Here's what the real cost is — and what to do instead.

Ugo Mbelu·March 14, 2026·5 min read
Industry Insights

Why Architecture Firms Struggle with PM

Architecture firms don't struggle with PM because architects are bad managers. The problem is structural — and it starts in architecture school.

Ugo Mbelu·March 14, 2026·4 min read
Document Control

Managing Addenda and Bulletins on Projects

Addenda and bulletins are where document control goes wrong on construction projects. Here's how to manage them so the field always has the right information.

Ugo Mbelu·March 14, 2026·4 min read
Project Management

Task Systems Architecture Teams Will Use

The best task management system is the one your team actually uses. Here's how to design one that sticks — without overcomplicating it.

Ugo Mbelu·March 14, 2026·4 min read
Project Management

Client Portals for Architecture Firms

Most architects share information with clients via email attachments and shared drive links. There's a better way — and it doesn't require enterprise software to get there.

Ugo Mbelu·March 12, 2026·5 min read