Correction letter tracking for civil engineering
Track grading, drainage, and site development correction items through plan check.
Overview
Civil and grading plan checks involve multiple reviewing agencies — building department, public works, fire, and sometimes a separate grading division. Correction items from different agencies arrive at different times, in different formats, and require different consultants to resolve. Keeping them coordinated is the core challenge.
Common civil engineering correction items
- Drainage calculations not provided or do not match proposed grades
- Low impact development (LID) BMP design incomplete
- Emergency overflow path not shown for retention basin
- Street improvement plan not submitted to public works
- Sewer/water lateral sizes not specified on utility plan
Field data from plan check submissions in California jurisdictions. Codes reference California Building Code (CBC) unless noted.
How Olumba tracks civil engineering corrections
Civil projects often straddle multiple agencies. Olumba tracks correction items by department so grading corrections, public works comments, and fire access items stay separated — and each consultant sees only what's assigned to them.
Try it free — upload a correction letter