Parse your Los Angeles correction letter
Upload a plan check correction letter from the City of Los Angeles. Olumba Align reads every comment, sorts by department, and flags code references.
No signup required. PDF only.
Los Angeles plan check departments
Building & Safety (LADBS)
~21 day reviewPlan check corrections typically arrive as a multi-page PDF with items grouped by discipline. LADBS uses a numbered correction format.
Fire Department (LAFD)
~14 day reviewFire corrections focus on sprinkler coverage, egress widths, and fire-resistance ratings.
Planning
~28 day reviewPlanning corrections often involve setback calculations, parking requirements, and density compliance.
What we know about Los Angeles plan checks
LADBS initial plan check typically takes 15-25 business days. Rechecks after corrections average 10-15 days.
Title 24 energy documentation and accessibility path-of-travel calculations are the most frequently cited corrections on LADBS letters.
LADBS groups corrections by discipline but uses a flat numbered list. Olumba Align re-tags each item to the correct department for routing to your team.
Got a Los Angeles correction letter?
Upload it. See your checklist in 30 seconds. Free.
Try Olumba Align — Free