Olumba Align / Los Angeles

Parse your Los Angeles correction letter

Upload a plan check correction letter from the City of Los Angeles. Olumba Align reads every comment, sorts by department, and flags code references.

📊18-35 correction items on a typical LADBS plan check letter

✦ Olumba · Parsed Results

Found 3 departments in Los Angeles plan check letters.

Los Angeles plan check departments

Building & Safety (LADBS)

~21 day review
18-35 items

Plan check corrections typically arrive as a multi-page PDF with items grouped by discipline. LADBS uses a numbered correction format.

CBC §1004.1CBC §1011.5.2CBC §1604.4LAMC §91.106.4.1

Fire Department (LAFD)

~14 day review
5-12 items

Fire corrections focus on sprinkler coverage, egress widths, and fire-resistance ratings.

CFC §901.3CFC §903.2CFC §907.2

Planning

~28 day review
3-8 items

Planning corrections often involve setback calculations, parking requirements, and density compliance.

LAMC §12.21LAMC §12.22LAMC §14.00

What we know about Los Angeles plan checks

review times

LADBS initial plan check typically takes 15-25 business days. Rechecks after corrections average 10-15 days.

common corrections

Title 24 energy documentation and accessibility path-of-travel calculations are the most frequently cited corrections on LADBS letters.

tips

LADBS groups corrections by discipline but uses a flat numbered list. Olumba Align re-tags each item to the correct department for routing to your team.

✦ Want Olumba to track responses?

Create a free account — Olumba saves these corrections to a project and tracks each department's response automatically.

Start free →

Got a Los Angeles correction letter?

Upload it. See your checklist in 30 seconds. Free.

Try Olumba Align — Free