Parse your Los Angeles correction letter
Upload a plan check correction letter from the City of Los Angeles. Olumba Align reads every comment, sorts by department, and flags code references.
No signup required. PDF only.
✦ Olumba · Parsed Results
Found 3 departments in Los Angeles plan check letters.
Los Angeles plan check departments
Building & Safety (LADBS)
~21 day reviewPlan check corrections typically arrive as a multi-page PDF with items grouped by discipline. LADBS uses a numbered correction format.
Fire Department (LAFD)
~14 day reviewFire corrections focus on sprinkler coverage, egress widths, and fire-resistance ratings.
Planning
~28 day reviewPlanning corrections often involve setback calculations, parking requirements, and density compliance.
What we know about Los Angeles plan checks
LADBS initial plan check typically takes 15-25 business days. Rechecks after corrections average 10-15 days.
Title 24 energy documentation and accessibility path-of-travel calculations are the most frequently cited corrections on LADBS letters.
LADBS groups corrections by discipline but uses a flat numbered list. Olumba Align re-tags each item to the correct department for routing to your team.
✦ Want Olumba to track responses?
Create a free account — Olumba saves these corrections to a project and tracks each department's response automatically.
Start free →Got a Los Angeles correction letter?
Upload it. See your checklist in 30 seconds. Free.
Try Olumba Align — Free