Los Angeles building permits
What plan check looks like in City of Los Angeles — who reviews a set, what they tend to flag, and what to do with the correction letter when it lands.
18-35 correction items on a typical LADBS plan check letter
Parse a Los Angeles correction letter — freeWho reviews your set in Los Angeles
3 reviewing departments seen in Los Angeles plan check letters.
Building & Safety (LADBS)
~21 day reviewPlan check corrections typically arrive as a multi-page PDF with items grouped by discipline. LADBS uses a numbered correction format.
Fire Department (LAFD)
~14 day reviewFire corrections focus on sprinkler coverage, egress widths, and fire-resistance ratings.
Planning
~28 day reviewPlanning corrections often involve setback calculations, parking requirements, and density compliance.
Los Angeles plan check, answered
How long does Los Angeles plan check take?
LADBS initial plan check typically takes 15-25 business days. Rechecks after corrections average 10-15 days.
What do Los Angeles plan checkers commonly flag?
Title 24 energy documentation and accessibility path-of-travel calculations are the most frequently cited corrections on LADBS letters.
Any advice for a Los Angeles submittal?
LADBS groups corrections by discipline but uses a flat numbered list. Olumba Align re-tags each item to the correct department for routing to your team.