RFI Tracker for Architecture & Engineering Teams

Track requests for information from submission through resolution

RFI TrackerUsed by 2 teams

A comprehensive RFI tracking template designed specifically for architecture and engineering firms managing the design phase. Track every RFI from initial question through official response, with built-in fields for priority, discipline, ball-in-court assignment, due dates, and document linkage.

This template follows the standard AEC RFI workflow:

1. A team member or contractor submits an RFI with a question, drawing reference, and required response date.

2. The RFI is assigned to the responsible party (ball-in-court) with a priority level.

3. Responses are tracked in a thread until an official answer is provided.

4. The RFI is closed with a full audit trail of who responded and when.

Most small A&E firms manage RFIs in email threads and spreadsheets. This template gives you the structure without the overhead of enterprise tools like Procore or Autodesk Build.

What's included

  • ✓Sequential RFI numbering per project
  • ✓Status tracking: Draft → Open → Responded → Closed
  • ✓Priority levels: Low, Normal, High, Urgent
  • ✓Ball-in-court assignment tracking
  • ✓Due date and response date fields
  • ✓Discipline tagging (Architectural, Structural, MEP, Civil)
  • ✓Drawing/document reference linkage
  • ✓Cost and schedule impact fields
  • ✓Response threading with official answer marking
  • ✓Full audit trail

Who this is for

Architecture and engineering firms managing design-phase RFIs — particularly firms with 5-25 people who currently track RFIs in email or spreadsheets.

Preview

Template preview

RFI #SubjectDescriptionDisciplineStatusPriority
#001Structural connection at grid B-4——OpenHigh
#002MEP ceiling height coordination——RespondedNormal
#003Fire rating clarification – stair B——DraftUrgent