Site Plan for Permit: What to Show and How to Draw It

Updated 8 min read

Short answer

A site plan for a permit is a scaled drawing of your lot showing property lines, existing and proposed structures, distances to the lines, streets and easements. Reviewers use it to check zoning, so match your city's own checklist.

Typical scale
1" = 20' (Kitsap County, WA policy)
Kitsap Public Health policy 2
Contour interval asked for
5 ft minimum
Monterey County, CA site plan checklist
Survey trigger
New structures, additions, pools, retaining walls
Johns Creek, GA site plan guidelines
On this page (7)
  1. What a site plan for permit review has to show
  2. How to draw the site plan step by step
  3. What reviewers are checking on the site plan
  4. When you need a site plan, and when you need a survey
  5. Site plans for common projects
  6. Common mistakes that trigger a correction
  7. Common questions

A site plan for permit applications is a scaled, top-down drawing of your lot. It shows the property lines, every existing structure, the new work, the distances between them and the lines, and any streets, easements and utilities that touch the parcel. The building department uses it to check zoning: setbacks, lot coverage and where the work sits relative to the lot. The exact list comes from your city or county checklist, so treat the items below as the common core, not the rule for your lot.

Most correction letters about site plans are about the same few things: missing dimensions, no scale, a setback that isn't measured, or an easement nobody drew. This guide covers what to put on the sheet, how the requirement changes by jurisdiction, and when a homeowner can draw it themselves.

What a site plan for permit review has to show

Model codes set the principle, and cities set the details. Several jurisdictions that adopt the ICC language ask for a scaled plan showing the size and location of new construction and existing structures on the site, with distances from lot lines and established street grades. Examples in search results include Massachusetts 780 CMR 107.2 and the Rhode Island plot plan statute. The section number for this requirement shifts between editions of the IBC, so cite your adopted edition rather than a number from a blog.

Public handouts then list what the reviewer wants to see. The table compares three, all from the issuing agency's own pages.

ItemMonterey County, CANashville, TN (Metro Codes)Ocean City, MD
North arrow and scaleYesNot stated in the snippet reviewedYes
Property lines with dimensionsYesProperty lines shownNot stated in the snippet reviewed
Roads, streets, drivewaysYesStreets, alleys and drivewaysNot stated in the snippet reviewed
EasementsYes, including utility easementsYesNot stated in the snippet reviewed
Building distance to lot linesNot stated in the snippet reviewedYesNot stated in the snippet reviewed
Utilities and parkingNot stated in the snippet reviewedUtility locations, parking with accessible spacesNot stated in the snippet reviewed
OtherPreparer's name and address, slope contours at 5 ft minimum intervalBuilding plans also requiredStreet address, legal description, owner, zoning

North arrow and scale

Monterey County, CA
Yes
Nashville, TN (Metro Codes)
Not stated in the snippet reviewed
Ocean City, MD
Yes

Property lines with dimensions

Monterey County, CA
Yes
Nashville, TN (Metro Codes)
Property lines shown
Ocean City, MD
Not stated in the snippet reviewed

Roads, streets, driveways

Monterey County, CA
Yes
Nashville, TN (Metro Codes)
Streets, alleys and driveways
Ocean City, MD
Not stated in the snippet reviewed

Easements

Monterey County, CA
Yes, including utility easements
Nashville, TN (Metro Codes)
Yes
Ocean City, MD
Not stated in the snippet reviewed

Building distance to lot lines

Monterey County, CA
Not stated in the snippet reviewed
Nashville, TN (Metro Codes)
Yes
Ocean City, MD
Not stated in the snippet reviewed

Utilities and parking

Monterey County, CA
Not stated in the snippet reviewed
Nashville, TN (Metro Codes)
Utility locations, parking with accessible spaces
Ocean City, MD
Not stated in the snippet reviewed

Other

Monterey County, CA
Preparer's name and address, slope contours at 5 ft minimum interval
Nashville, TN (Metro Codes)
Building plans also required
Ocean City, MD
Street address, legal description, owner, zoning

Sources: Monterey County, Metro Nashville drawing requirements, Ocean City, MD. A blank cell means the page text I could read didn't say, not that the city doesn't ask for it.

Read together, the common core is:

  1. Lot boundaries with dimensions. Every property line, with its length.
  2. North arrow and scale. A bar scale survives printing at a different size; a written ratio doesn't.
  3. Existing structures. House, garage, sheds, decks, pools, anything permanent.
  4. The new work. Drawn differently from what exists (heavier line or hatch) and labeled.
  5. Distances from each structure to the property lines. Measured and written on the plan.
  6. Streets, driveways and access. Including the street name.
  7. Easements and utilities. Drawn and labeled with their widths where known.
  8. Identifying data. Address, parcel number or legal description, owner, preparer.

How to draw the site plan step by step

  1. Get the checklist first. Search your building department's site for "site plan requirements" or "plot plan." Some counties publish an example sheet. Sacramento County's GI-29 plot plan example is one. Its extracted text only partly shows what it asks for, so use the current version from the county.
  2. Start from a boundary source. A recorded plat, a prior survey or a surveyor's drawing gives you true lot lines. Don't trace the lot from a satellite image.
  3. Choose a scale and say so. A common choice is 1" = 20'. A Kitsap County, WA policy requires 1"=20' for its site plans. Another city may allow 1/8" = 1' or a different engineering scale. Pick the largest scale that fits the lot on your sheet size.
  4. Draw the lot, then the existing structures. Dimension the buildings, not only the lot.
  5. Add the proposed work. Show the footprint, including roof overhangs and steps if your jurisdiction measures setbacks to them. Ask which.
  6. Dimension every setback. Measure from the structure to the property line and write that distance on the plan.
  7. Add easements, utilities and access. If you don't know where an easement runs, your title report or plat shows it.
  8. Label, sign, and size the sheet. Placer County, CA, for example, asks for 11x17 minimum and 24x36 for full review submittals. Check the sheet size your office accepts before you print.

Expirations slip when nobody owns the date. Track filing and permit dates with reminders →

What reviewers are checking on the site plan

The reviewer is mostly doing zoning math, not structural review. They compare the numbers on your plan to the zoning code for your parcel:

  • Setbacks. The distance from each structure to the front, side and rear lines against the minimums for your zone. A sheet that shows the building but no measured distance usually draws a correction.
  • Lot coverage and height. Footprint area against the allowed percentage, and the height you've noted against the limit.
  • Easements. Building inside an easement is often restricted, so an easement that isn't drawn can hide a conflict until a reviewer finds it.
  • Access and parking. Nashville's requirements, for example, call for parking including accessible spaces.
  • Consistency with the floor plans. If the site plan says the addition is 20 ft wide and the floor plan says 22 ft, the reviewer will flag it.

Some jurisdictions route this through a separate zoning review before or alongside the building permit. Nashville's published guidance for decks suggests contacting the zoning office to confirm setback compliance before filing.

When you need a site plan, and when you need a survey

A site plan is not required for every permit. Nashville's requirements list site plans and building plans for new buildings and additions, but only building plans for renovations and changes of occupancy. Johns Creek, GA says a site plan is needed if any soil disturbance is involved.

A site plan and a survey are different documents:

Site planLand survey
Who prepares itOften the owner, designer or contractor, depending on the cityA licensed land surveyor
What it provesWhere the work sits and that it meets zoningWhere the boundaries are
Signed and sealedUsually notYes

Who prepares it

Site plan
Often the owner, designer or contractor, depending on the city
Land survey
A licensed land surveyor

What it proves

Site plan
Where the work sits and that it meets zoning
Land survey
Where the boundaries are

Signed and sealed

Site plan
Usually not
Land survey
Yes

Johns Creek is explicit about the line. Its guidance says a survey is required for new structures, additions, pools and retaining walls, or as requested by staff, and that a "full" site plan can't substitute for it. It also says a surveyor's signed survey can't simply be reused as someone else's site plan unless the surveyor's name and seal are struck and a statement added that another person drew it. Rules like this are local. If your lot lines are in doubt, or you're close to a setback, get a survey. See our guide on what a construction survey is and when you need one.

Site plans for common projects

The same sheet serves many small projects, but the details change:

For rules in a specific city, see our Los Angeles permit guide for one jurisdiction we cover, and use your local building department's checklist as the final word.

Common mistakes that trigger a correction

  • No scale, or a scale that's wrong after the PDF is resized.
  • Setbacks shown by eye, not dimensioned.
  • Existing and proposed work drawn the same, so the reviewer can't tell what's new.
  • Easements and utilities omitted.
  • The plan doesn't match the floor plans.
  • A surveyor's seal on a plan the surveyor didn't draw, in jurisdictions that prohibit it.
  • Wrong sheet size or not enough copies for a paper submission. Placer County, for example, asks for three copies with a construction permit application, and up to five with a septic system.

When a correction letter does come back, answer every comment with a revised sheet and a short note. See how to respond to a plan check correction letter.

Common questions

Can I draw my own site plan for a building permit?

Often yes, for simple residential work. Some jurisdictions accept an owner-drawn plan on a template. Others require a licensed surveyor's drawing or a signed survey for new structures, additions, pools or retaining walls, as Johns Creek does. Ask your building department which applies.

What scale should a site plan be?

Whatever your jurisdiction states. A scale of 1" = 20' is common in published requirements and is mandatory in Kitsap County, WA. Include a bar scale on the sheet.

What size should the site plan sheet be?

It depends on how you submit. Placer County, CA asks for an 11x17 minimum and 24x36 for full review submittals. Many portals accept PDFs at one of those sizes.

Do I need to show setbacks on a site plan?

Yes in most places, and measured. Reviewers check the distance from each structure to the property lines against the zoning minimums. The minimums themselves come from your zoning code, not the building code.

Is a site plan the same as a plot plan?

In practice, yes. Different agencies use "site plan," "plot plan" or "plan view" for the same drawing. Larger commercial projects can have a more detailed site plan with grading and drainage.

Do I need an architect to prepare a site plan?

Not always. Small residential jobs are often drawn by the owner or a designer. Commercial or complex projects, and lots with grading, drainage or septic questions, usually need a licensed professional. Your department's checklist will say.

Put every permit date on the calendar

Add the dates as tasks with an owner. Reminders go out 7 and 3 days before, the day before, and on the day.